Cutalong Agronomy Center – Tributer Resort
Mineral, VA
Construction Type: Combination of pre-engineered metal building and wood framed construction- golf operations support and management facility.
Client: Reef Destinations
Architect: Method Studio, https://method-studio.com/
Start / End Date: June 2026 / October 2027
UTICA was selected by REEF to deliver a new state of the art Agronomy facility designed to improve operational efficiency, streamline workflows, and support the needs of the golf operations team.
The project included a four-building complex featuring pre-engineered metal buildings for equipment storage, maintenance, and mechanical operations, along with a wood-framed building housing offices, locker rooms, a conference area, and a fully equipped kitchen and break room for the golf maintenance team.
Comprehensive site development and infrastructure improvements included wet and dry utility installation, septic system upgrades, and construction of the new facilities. Additional site amenities included an equipment washdown area, fuel filling station, and designated mulch and sand storage areas.
The completed facility provides a purpose-built environment that enhances day-to-day golf operations through improved functionality, efficiency, and dedicated support spaces.


